Wind Parks

    Wind Parks in Albania

    Two advanced-stage wind parks in Albania, equipped with modern Nordex N163-5.7 turbines. All permits, land and grid connection — secured. Albania imports over 35% of its electricity and has EU-aligned decarbonization targets.

    148.4 MW
    Installed capacity
    26
    Turbines
    374K MWh
    Annual generation
    ~187K
    t CO₂ avoided / yr
    Portfolio

    Our Projects

    Two projects in advanced stages, ready for construction.

    Sarandë (Southern Albania)
    80 MW

    Sarandë (Southern Albania)

    Albania
    Installed capacity80 MW
    Number of turbines14 × Nordex N163-5.7 (5.7 MW)
    Annual generation190,000 MWh
    CO₂ avoided / year~95,000 t
    Grid connection150 kV
    PermitsComplete (environmental, archaeological, construction)
    Drin (Northern Albania)
    68.4 MW

    Drin (Northern Albania)

    Albania
    Installed capacity68.4 MW
    Number of turbines12 × Nordex N163-5.7 (5.7 MW)
    Annual generation184,000 MWh
    CO₂ avoided / year~92,000 t
    Grid connection154 kV
    PermitsComplete (environmental, archaeological, construction)
    Regional advantage

    Why Wind Energy in the Balkans?

    Strong wind potential

    The Dinaric Alps and Pindus mountains deliver consistent year-round wind regimes.

    Grid support

    Local wind parks reduce electricity import dependence and strengthen regional grid stability.

    EU alignment

    Balkan states are accelerating decarbonization targets in line with the European Green Deal.

    Mature technology

    Modern 5+ MW turbines (Nordex N163) extend lifetime and efficiency vs prior generations.