Back to Regulation Hub
    Low VoltagePublished: 30 November 2024

    Campus Microgrids – LV Islanding Rules

    Guideline 11/2024 requires a synchronous-return test before reconnecting LV microgrids.

    Share
    Campus Microgrids – LV Islanding Rules

    Every LV campus microgrid up to 1 MW must run a semi-annual islanding drill and prove resynchronization within ±0.1 Hz and ±10°.

    Logs must be stored for 5 years or the operator loses reconnection privileges after real events.

    Maintain a switching manual listing authorized staff and approval checkpoints.