    Low VoltagePublished: 22 January 2025

    Small-Business DR – Code 01/2025

    New DR code requires 5-minute telemetry for LV sites above 100 kW.

    Share
    Small-Business DR – Code 01/2025

    LV customers above 100 kW enrolled in DR must stream 5-minute telemetry (JSON fields time, load_kW, reduction_kW).

    They earn 20₪ per curtailed kW, but missing telemetry for 30+ minutes in a month resets the payment.

    Upgrade BMS logic to execute automatic set-points and log signed commands for audits.