    Low VoltagePublished: 30 January 2025

    Structural Attestation for Rooftops ≤50 kW

    Planning Circular 01/2025 mandates engineer affidavits for rooftop PV ≤50 kW.

    Share
    Structural Attestation for Rooftops ≤50 kW

    All LV rooftop systems up to 50 kW now require a structural engineer affidavit covering added load (kg/m²), drainage, and anchor layout.

    Form 1060 must accompany the simplified permit or municipalities will reject the request.

    Create templates for installers so submissions are consistent.